Xiongan Outlets Play Planet, Hebei

Xiongan, Hebei, China · Full-floor retail retrofit

Xiongan Outlets Play Planet indoor play zone rendering
Xiongan Outlets Play Planet venue floor plan
Xiongan Outlets Play Planet indoor sports zone aerial rendering
Xiongan Outlets Play Planet bowling and golf simulator zone rendering
Xiongan Outlets Play Planet industrial concrete scene rendering

Project snapshot

Location
Xiongan, Hebei, China
Area
Full-floor retail retrofit
Industry
Shopping centre · digital sports
Venue type
EPC+O project · sports and play anchor inside a mall
Equipment
Digital Sports · Kids Playground · Arcade & Music · VR & Immersive · Shooting & Archery · Racing & Theater

The challenge

Xiongan Outlets is a large mall in the region. Three years after opening it was struggling to lease: large areas of floor space remained unlet and footfall was weak. The problem was not a missing tenant but a missing reason for people to come — without destination traffic, leasing has no bargaining power. By July 2026 the mall needed a single large format that could both draw crowds and absorb area.

The approach

PowerChina's Xiongan Outlets partnered with Sports Ant under an EPC+O model — design, procurement, construction and post-opening operations carried by one party. Rather than copying a standard store format, the plan started from two questions: what the mall actually needed (which traffic was missing, which floors were hardest to let) and what the local market looked like (family composition and spending habits). Eight components followed — digital sports, soft play, high-rope adventure, arcade, VR, laser tag, bumper cars and light F&B — so that the venue itself becomes the mall's destination rather than another tenant.

Delivery journey

  1. Mall diagnosis

    Start from what the mall lacks: which floors sit empty, where traffic comes from, who lives nearby. The plan targets the leasing problem, not a generic store format.

  2. Format mix

    Eight components combined by audience and dwell time, covering families, younger visitors and social occasions, without pooling traffic in one zone.

  3. Design and build

    Developed against the mall's existing structure and services to limit disruption to trading.

  4. Opening

    Opened July 2026, with the venue acting as the mall's anchor for overall footfall.

  5. Operations

    The O in EPC+O — operations carried by us after opening, connecting the opening rhythm to daily operating practice.

Operations loop

  • The venue as the mall's destination: visitors come for it and spend elsewhere, which is what restores leasing leverage.
  • EPC+O: design, procurement, construction and operations with one party, so the mall deals with a single counterpart.
  • State-owned enterprise compliance: procurement and acceptance follow SOE requirements, with full process documentation.

Discuss a similar project?

Leave a contact and we will reply within the agreed window, starting from your site and budget tier.