ROI guide (public edition)

We give you the method and definitions up front; per-case modelling opens once the parameters are ready.

In configuration

The modelling parameters are not ready yet; to avoid unreliable numbers, per-case modelling stays greyed out.

Book a call for a model
Three scenarios

Payback curve

Parameters are not ready; per-case modelling and the three scenarios stay greyed out.

Payback method

Payback is the month in which cumulative net cash flow first turns positive, accumulated month by month from recoverable net cash flow. The revenue and cost basis, currency, tax treatment and sample window are kept consistent and stated alongside the result.

Payback is the month in which cumulative net cash flow first turns positive, accumulated month by month; the revenue and cost basis, currency and sample window are kept consistent.

Area-to-equipment framework

Tiers are set by venue size and note the direction of the product mix for each; tiers are described without specific amounts.

Area framework is not open yet

The area-to-equipment data is not ready, so this area stays greyed out.

Compliance list

Each market's required standard categories are listed; products are always stated as designed-to-standard, not as holding the certification.

  • CE

    欧盟市场准入要求相应的 CE 标记。此处仅说明该制度存在,页面表述一律为「符合该标准设计」,不代表已取得该认证。

  • EN 1176

    游乐设施安全相关标准。此处仅说明该制度存在,页面表述一律为「符合该标准设计」,不代表已取得该认证。

Per-case modelling is not open yet

The modelling parameters are not ready yet; to avoid unreliable numbers, per-case modelling stays greyed out.