Turnkey venue solutions

We follow the Sandler sequence: see the process and responsibilities first, then move to proposal and configuration.

New venue from zero to opening

For developers and operators who need venue planning, equipment and delivery joined up.

Upgrade of an existing site

For venues looking to lift footfall and yields by replacing dated attractions.

Multi-site rollout

For brands replicating a standard format across several cities.

Match your situation

Find your situation first, then the matching combinations, operations services and reference cases.

New venue: from zero to opening

Site assessment, layout planning, equipment and opening rhythm — advanced by stage.

Common situations

  • Site conditions and usable area are not yet clear
  • Unclear how equipment and the build schedule join up
  • Opening rhythm and staffing lack a clear sequence

Operations services

Opening runway supportStaff training

Book a turnkey venue consultation

Upgrade of an existing site

Replace and add attraction points on an existing site with minimal disruption.

Dongguan LCC PARK digital sports hall overall venue rendering
Dongguan LCC PARK digital sports hall overall venue rendering (2)

Common situations

  • Dated attractions no longer draw visitors
  • Footfall and yield are under pressure
  • How to retrofit with little impact on trading

Operations services

Operations review

Book an upgrade consultation

Multi-site rollout

Replicate a standard format across cities with consistent configuration and operations.

Common situations

  • Standards diverge across sites
  • Replication cycles run long
  • Operating practices are hard to align

Operations services

Opening runway supportOperations review

Book a rollout consultation

Operations loop

Good outcomes come from day-to-day operations. We set out the method, the services and who does what — method, not promises. The exact scope and stage schedule follow the contract and the list confirmed by both parties.

Operations services

Opening runway support

From preparation to opening, a staged checklist of actions and responsibilities.

A staged action list and role assignment sheet

Staff training

Front-line training on equipment operation, safety and basic service.

A training outline and onboarding checkpoints

Operations review

A periodic review of footfall, repurchase and attraction performance, with next-step suggestions.

A review record and adjustment suggestions

Membership and points design

Growth-value-driven membership tiers and benefits, with a closed loop for earning and spending points.

A tier-and-benefits table and a points rulebook

Yearly campaign calendar

A yearly calendar of campaign themes sequenced by quarter and need level, with a multi-channel publishing plan.

A yearly campaign calendar and publishing checklist

Staffing and training

Headcount and responsibility boundaries for direct-run and franchise lines, plus layered training (service standards, role skills, operations management) with assessments.

Job descriptions, a training plan and assessment sheets

Floor checks and weekly review

Daily floor checks and a weekly operations review, closing site issues within the week rather than at month end.

A floor-check list and a review-minutes template

Pilot before scale

Pilot a new format on a small scale, fix what surfaces, then open it fully — rather than rolling out in one move.

A pilot checklist and a scale-up checklist

Three-phase opening campaign

Split the opening into three phases — preheat, launch and follow-through: lock demand early, make noise at launch, then sustain it rather than a one-day spike.

An opening schedule and responsibility sheet

Emergency maintenance and spares

An emergency maintenance team with a response flow and a spare-parts list, keeping equipment downtime as short as possible.

Inspection sheets, a repair flow and a spares list

Opening runway

  1. Preparation

    • Confirm site conditions, circulation and attraction layout
    • Agree role definitions and the staffing plan
  2. Opening

    • Run the opening rhythm from the staged checklist
    • Complete equipment commissioning and front-line training
  3. Ramp-up

    • Review footfall and attraction performance by cycle
    • Adjust attractions and events based on the review

Operations playbook

Circulation shapes yield

Interleave high- and low-frequency attractions so visitors pass more points, rather than relying on a single hit.

The weekday rhythm

A lively opening is easy; steady weekdays are hard. A weekly rhythm of events and membership is usually steadier than ad-hoc promotions.

Tiers and growth value

Turn spending, activity and tasks into growth value so tiers and benefits rise with real behaviour, rather than one-off promotions.

The points loop

Give points a destination at both ends: activity and tasks earn them, while redemption, offset and events spend them.

Sequence campaigns by need

Lay out the year's campaigns by need level to avoid clustering similar promotions; plan once, then publish across channels in one pass.

Tasks and referrals

Use check-ins, invitations and achievements to bring people back, so existing visitors become a natural entry point instead of relying on paid acquisition.

Public reach, private repurchase

Publish campaigns to public channels in one pass and push them harder in private communities: public reach brings people in, private groups keep them.

Pilot, then scale

Pilot a new format or campaign on a small scale, fix what surfaces, then open it fully.

Coaches and community

Coaches share tips and run online challenges, turning one-way service into a community that runs on its own.

Layered training

Train in layers — service standards, role skills, operations management — with assessments, so the service standard transfers to new sites and new staff.

Three-phase opening

An opening is not a single day: lock the first members during preheat, make noise at launch, then catch the heat in the follow-through.

Fill weekdays with group bookings

Work with schools and companies on group and team-building packages to fill weekday dead hours instead of relying on weekends.

Events and honour boards

Keep high-engagement players with events, leaderboards and honours — your best players become the venue's living showcase.

Asset library and training videos

Keep brand assets and training videos in a reusable library so new sites and new staff can draw on them directly.

Metrics to watch

Repurchase rate

Share of returning visitors in total footfall.

Track the trend by cycle to judge membership and event design.

Attraction heat

Relative usage frequency of each attraction.

Spot cold spots and adjust circulation or content.

Member retention

Share of members still active in later cycles.

Assess whether benefits and content refresh keep drawing members back.

Member tier movement

Share of members who move up a tier.

Judge whether growth value and benefits actually drive behaviour.

Campaign participation

Share of active members who join a campaign.

Judge whether the campaign line-up and themes are on target.

Check-in continuity

Share of members who keep checking in across a campaign period.

Assess whether the mechanics turn one-off participation into a habit.

Publishing rhythm

Number of public and private posts per period.

Detect gaps in channel operations.

Equipment availability

Share of attractions usable during opening hours.

Judge whether maintenance and spares keep up.

Advance booking conversion

Share of advance bookings that turn into visits.

Measure whether early demand-locking actually works.

Common concerns

The questions buyers ask most, laid out up front before the next step.

Is the investment too high?
Cost follows configuration and site conditions. We align on the budget tier and site first, then propose a matching configuration — no blanket quote on the page.
Will the payback be too slow?
We make the method explicit first: compare conservative, neutral and optimistic scenarios; the actual figures depend on the site and daily operations.
What if the space is limited?
We propose a high-density layout for a small footprint: first what your area can hold, then the trade-offs.
What if we have no operations experience?
Operations support and staff training come with it: the method, the services and who does what, alongside the opening stage (scope and stages as confirmed by both parties).
We are still comparing a few suppliers.
We hand you a self-scoring framework (configuration, delivery, operations support, after-sales) so you can compare objectively — without disparaging others.
How is after-sales handled?
We set out the response window, spare-parts supply and remote support, and put them into the agreed delivery scope.

How the conversation runs

Diagnose and size up first, confirm the budget tier and decision maker, then move to proposal and configuration — each step states the next one first.

  1. Needs and site

    We start with your site conditions, budget tier and goals, and agree who does what.

  2. Planning and configuration

    We provide the venue plan and equipment configuration, with lead times and responsibilities.

  3. Delivery and operations support

    We deliver and install as agreed, and support operations and staff training.

Three budget tiers

Pick a tier first; we then match the proposal and configuration to it.

Venue-level qualifications & certifications

Company qualifications, management-system certifications and equipment test reports back every turnkey delivery; browse the full list by category on the qualifications page.

  • Enterprise qualification

    National High-Tech Enterprise Certificate

    National High-Tech Enterprise recognition (Cert. No. GR202444000981, valid until 2027-11-18), reflecting independent R&D and innovation capability in amusement equipment.

  • Export certification

    Simulation Machine — RoHS Certificate of Conformity

    Simulation Machine (models SQV-2511–2520) tested for RoHS 2.0 (2011/65/EU) restricted substances; the results comply with the limits (Report No. HTT202507832R).

  • Export certification

    Ticket Dispenser Machine — CE Verification of LVD & EMC Compliance

    Ticket Dispenser Machine (models SQV-25701–25710) verified against EU Low Voltage Directive 2014/35/EU and EMC Directive 2014/30/EU (Cert. No. M.2025.206.C122549), supporting the compliance case for EU market access.

  • Export certification

    Virtual Reality 360-degree Aircraft — CE Verification of LVD & EMC Compliance

    Virtual Reality 360-degree Aircraft (models SQV-25601–25610) verified against EU LVD 2014/35/EU and EMC 2014/30/EU (Cert. No. CLGD25061071598), supporting the compliance case for EU market access.

  • Export certification

    Simulation Machine — CE Verification of LVD & EMC Compliance

    Simulation Machine (models SQV-2511–2520) verified against EU LVD 2014/35/EU and EMC 2014/30/EU (Cert. No. CLGD25050970202), supporting the compliance case for EU market access.

  • Export certification

    Gift Machine — CE Verification of LVD & EMC Compliance

    Gift Machine (models SQV-2501–2510) verified against EU LVD 2014/35/EU and EMC 2014/30/EU (Cert. No. CLGZ25042169536), supporting the compliance case for EU market access.

  • Inspection report

    9D Two-Seat Egg Chair — Inspection Report

    9D Two-Seat Egg Chair (model SQV-srdy001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT240619008).

  • Inspection report

    Dance Machine — Inspection Report

    Dance Machine (model SQV-twj0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23120532).

  • Inspection report

    Curved Air Hockey — Inspection Report

    Curved Air Hockey (model SQV-qmqgq0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23120535).

  • Inspection report

    Two-Player Motion Motorcycle — Inspection Report

    Two-Player Motion Motorcycle (model SQV-srdgmt0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23120536).

  • Inspection report

    Baseball Simulator — Inspection Report

    Baseball Simulator (model SQV-mnbq-0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23070440).

  • Inspection report

    Light-and-Shadow Climbing — Inspection Report

    Light-and-Shadow Climbing (model SQV-gypy-0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23070445).

  • Inspection report

    City Basketball — Inspection Report

    City Basketball (model SQV-cslq-0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23070447).

  • Inspection report

    Optic Shooting — Inspection Report

    Optic Shooting (model SQV-gdsj-0001) commissioned-tested to GB 4943.1-2022 safety requirements; all tested items passed (Report No. WT23070453).

View all qualifications & certifications

Ready for a proposal?

After you leave a contact, we deliver the proposal and configuration within the agreed window.