Yangxi West Lake Park underground digital sports venue, Guangdong

Yangxi, Guangdong, China · 10,000 sqm

Yangxi West Lake Park underground play venue interior rendering (toy display and cashier area)
Yangxi West Lake Park underground play venue architectural floor plan
Yangxi West Lake Park underground play venue racing simulator zone rendering
Yangxi West Lake Park underground play venue karting track rendering
Yangxi West Lake Park underground play venue billiards area and entrance gates rendering

Project snapshot

Location
Yangxi, Guangdong, China
Area
10,000 sqm
Industry
Cultural tourism support · digital sports
Venue type
EPC+O project · underground digital sports venue with retail
Equipment
Digital Sports · Arcade & Music · VR & Immersive · Racing & Theater · Ball & Basketball

The challenge

The site is a civil-defence facility on the basement level beneath West Lake Park: 10,000 square metres, but with hostile constraints — only 2.5 metres of headroom, high humidity, and the need to satisfy both civil-defence usage policy and local expectations for a public space. Conventional large-format attractions do not fit, and conventional retail logic does not apply. Simply placing equipment in such a space would not produce a venue that lasts.

The approach

After several rounds of discussion and on-site survey with Hengjian, the project ran as EPC+O — design, procurement and construction under one party, with post-opening operations carried by the same side rather than handed off. Method first addressed constraints: shortlisting equipment models and mounting methods for 2.5 metres of clear height, setting protection and ventilation requirements for a humid underground environment, and mapping what civil-defence policy allows and forbids. Only then was the mix assembled — digital sports, arcade, VR, bumper cars and karts, pool tables and underground retail — not by packing six formats into 10,000 square metres, but by giving each a workable position within a low, deep-plan underground space and letting them draw traffic from one another.

Delivery journey

  1. On-site survey

    Conditions first: clear height, humidity, column grid, access points, fire requirements and civil-defence usage rules — recorded item by item.

  2. Policy and boundaries

    Working with Hengjian to confirm what may be retrofitted and marking out what may not.

  3. Format mix

    Mix allocated by headroom and depth: arcade and pool in low zones, VR and sports where height permits.

  4. Design development

    Build-ready plans with MEP requirements, including moisture control, ventilation and egress.

  5. Operations

    The O in EPC+O — operations carried by us after opening, connecting the opening rhythm to daily operating practice instead of withdrawing at handover.

Operations loop

  • EPC+O: design, equipment, construction and operations sit with one party, so responsibility does not break at the handover.
  • Constraints before format: clear height, humidity and policy boundaries are settled first, or the plan does not hold.
  • Equipment selected for low clearance: models and mounting chosen against 2.5 metres of usable height, not adapted afterwards.

Discuss a similar project?

Leave a contact and we will reply within the agreed window, starting from your site and budget tier.