First venue

I want to open a venue

Opening a digital sports venue is less about buying equipment and more about sequencing site, circulation, equipment, build schedule, staffing and opening. This page lays out that order.

Three things usually stall a first venue

These come from projects we have delivered, not speculation.

  • Site conditions and usable area are not yet clear

  • Unclear how equipment and the build schedule join up

  • Opening rhythm and staffing lack a clear sequence

Five steps

  1. 1

    Step 1 · Site assessment

    Check headroom, load capacity, column spacing, fire egress and power capacity first. These decide what fits and how much — designing before this is understood means rework later.

  2. 2

    Step 2 · Format and circulation

    The same floor area supports very different traffic and spend depending on format mix. Circulation answers: where guests enter, dwell, queue and spend.

  3. 3

    Step 3 · Equipment and schedule

    Equipment is not about price but fit with format, area and audience. The schedule is set here too — when to move in, commission and open.

  4. 4

    Step 4 · Build and installation

    Site conditions — power, load, flooring — are verified in advance so equipment fits on arrival. Coordination, not technology, is what usually goes wrong here.

  5. 5

    Step 5 · Opening and operations

    Opening is only the start. How roles are set, staff trained, daily work run and incidents owned decides whether a venue lasts.

Typical solution combinations for a first venue

  • Obstacle Course Challenge

    A timed, replayable fitness circuit that chains running, jumping, climbing, swinging and balance — for challenge tracks, competitions and team events.

    See this solution →
  • VR Large-Space Arena

    VR experience routes configured by space tier — from motion seats and capsules to full-arena large-space battles, combined to suit each site.

    See this solution →
  • AR Interactive Sports

    Motion tracking meets augmented reality, turning walls and floors into switchable sports courts for sports venues and shopping-centre atriums.

    See this solution →
  • Ball Sports Simulation

    Indoor, scoreable and rankable simulation units for baseball, tennis, football, golf and bowling — for sports venues and commercial spaces.

    See this solution →

What similar projects look like

  • Huai'an Digital Sports Hall

    Huai'an, Jiangsu, China · From several hundred sqm

    View case detail →
  • Guangzhou Miracle Digital Sports Hall

    Guangzhou, Guangdong, China · From several hundred sqm

    View case detail →
See all cases

What we support during opening

The period around opening is the most chaotic — these are what we do together.

  • Opening runway support

    From preparation to opening, a staged checklist of actions and responsibilities.

  • Staff training

    Front-line training on equipment operation, safety and basic service.

See our operations capability

How we start

No runaround. Here is what we ask in a first conversation, what you need to prepare, and how soon you get a direction.

  1. 1

    First conversation (about 40 minutes)

    We ask: where and how large the site is, headroom and load, your investment range, target opening date, and whether you have an operating team. Without these answers any direction is hollow.

  2. 2

    A direction, at no charge

    From that information we give an initial view on format mix and area allocation, including what this site suits and what it does not. No cost at this stage.

  3. 3

    Either way, say so directly

    If we judge the site unsuitable, we say so. If you decide we are not the right partner, say that too — it saves both sides time.

This describes our process only; it is not investment advice or a promise of returns.

Tell us about your site

Leave your details and we will give an initial direction following the process above — including if it is not a fit.